Start with quick clarity using our Explore tool. Then book a proper 30-minute design session. Before anything is installed, we verify the details so there are no surprises later.
After install, Jousto stays responsible with Jousto EMS — monitoring, alerts, and smarter control over time.
If it doesn’t load, use this link: Open Jousto Explore.
Prefer the direct booking page? Open design session.
Jousto Explore helps you compare solar, batteries, heat pumps and EV charging options quickly — and get pointed in the right direction without a sales ambush.
When you’re ready, book a 30-minute session with a qualified Solar PV, Battery and Energy Efficiency designer. We size the system around how you actually use energy — and what you’ll add next.
After the design session, we prepare the formal quote and verify the technical details. Photos, layouts, and electrical constraints are checked so install day is smooth.
Most systems are installed once… then left alone. Jousto EMS is the ongoing layer that monitors performance, improves behaviour, and flags issues early.
Pro 3EM monitoring of solar + grid, battery safety sensing (smoke + temp/humidity), and 24/7 alerts when anything drifts out of safe ranges.
Adds 2× Shelly Pro 2PM to control up to 4× 16A circuits (hot water, pool, HVAC etc.) using simple rules and schedules (set-and-forget).
Adds an Ampora EMS gateway for automated optimisation across loads, solar, batteries and tariffs — algorithm-driven, not manual babysitting.
Monitoring includes 12 months up-front, then an ongoing care plan that covers sensor batteries, solar panel cleaning, and a general maintenance check.
Start with Jousto Explore to get direction. Book the 30-minute session when you’re ready to size and verify properly.
Prefer to talk? SMS/Call 0489 261 333 • [email protected]

© Copyright 2026.Honen Lead Generation.
All Rights Reserved.
Phone: 0489 261 333
185 Morphett St, Adelaide, SA, 5000