Solar PV Systems | Jousto
Jousto Solar PV Systems
Get My Instant Quote
Step 2 ready — Viking-fast quotes ⚡

Go solar with confidence — and get a FREE Jousto Hub

For a limited time, every Solar PV system includes a FREE Jousto Energy Hub (RRP $249) — your smart home brain for automations and energy savings. Answer a few quick questions and see your tailored price in under 2 minutes, verified by real humans.

✓ Supply & install ✓ Grid paperwork ✓ Monitoring app ✓ Residential & Commercial (up to 39 kWp)
Aarno offering the Jousto Energy Hub
Limited-time bonus FREE Jousto Hub with Solar PV RRP $249 • This month only
⚡ Instant quote in ~2 minutes
🧠 Free Jousto Hub (RRP $249)
🧩 Tier-1 panels & trusted inverters
📍 Australia-wide pricing • SA special offers

What we offer

Solar panels

Solar Panels

Trina • LONGi • Canadian Solar • JA Solar • Jinko

Inverters

Inverters

Grid-Tied: GoodWe, Fronius
Hybrid: Solis, GoodWe, Sungrow, Fronius

Solar + Battery Packages

Solis • GoodWe • Sungrow • Fronius • BYD available. Add storage now or later — your quote will show options.

Popular packages

Solar panels with GoodWe inverter

Solar PV + GoodWe Inverter

Reliable performance, monitoring app, and clean install.

Solar panels with Fronius inverter

Solar PV + Fronius Inverter

Premium European brand with advanced monitoring.

Solar panels with Sungrow hybrid inverter

Solar PV + Sungrow Hybrid

Battery-ready from day one — add storage anytime.

Trina + Sungrow solar and battery package

Trina + Sungrow (PV + Battery)

High-value package combining Tier-1 panels with proven storage.

Trina + GoodWe solar and battery package

Trina + GoodWe (PV + Battery)

Smart, flexible storage with excellent monitoring and support.

Brands we supply

Inverters & Batteries
GoodWe
Solis
BYD
Sungrow
Fronius
Solar Panels
JA Solar
Jinko Solar
Canadian Solar
Trina Solar
LONGi Solar
Start here

Get your instant solar estimate

Takes ~2 minutes • Viking-fast • No obligation
Verified by real humans before installation
🎁
Bonus this month: FREE Jousto Energy Hub (RRP $249) with every Solar PV system.
* Standard residential installs & typical site conditions. STCs applied after postcode zone confirmation. Subject to site verification and stock availability.

Common questions

Is the instant estimate a final quote?
It’s a guide based on your inputs. The formal quote follows after photo verification by a human.
Do you handle grid connection and rebates?
Yes—grid paperwork is included. STCs are applied in your formal quote once we confirm your postcode zone.
Do you do commercial installs?
Yes — we supply & install residential and commercial systems up to 39 kWp. Use the instant quote to get indicative pricing and options.
© Jousto Energy — All rights reserved.
solar

How Fast Can a Commercial Energy System Be Installed? | Jousto

February 25, 20254 min read

Switching to a commercial energy system—whether it's solar power, battery storage, or a combination of both—is a smart investment for businesses looking to cut electricity costs and improve sustainability. However, one of the most common questions business owners ask is: How long does it take to install a commercial energy system?

The answer depends on several factors, including system size, complexity, site conditions, and approval processes. While smaller systems can be installed in a few days, larger commercial setups may take several weeks to a few months.

In this guide, we’ll break down the installation timeline, key factors that influence it, and how Jousto ensures a smooth and efficient installation process.

solar

Factors That Affect the Installation Timeline

The time required to install a commercial energy system varies based on several factors. Here are the main elements that determine the overall timeline:

1. System Size and Complexity

  • Small commercial solar systems (10–50kW) – Typically installed within 3–5 days.

  • Medium systems (50–100kW) – Installation may take one to two weeks.

  • Large commercial systems (100kW–1MW) – Can take several weeks to a few months, depending on the project.

The larger and more complex the system, the longer it will take to design, approve, and install.

2. Site Assessment & Energy Audit (1–2 Weeks)

Before installation begins, a thorough site assessment and energy audit is conducted to:

  • Evaluate roof space, shading, and structural integrity.

  • Assess energy consumption patterns to determine the best system size.

  • Identify switchboard and electrical infrastructure requirements.

This step is crucial in designing a system that maximises savings and efficiency.

3. Approvals and Permits (2–8 Weeks)

Commercial energy installations often require various approvals, including:

  • Grid connection approval from the electricity provider.

  • Council permits (if structural changes are needed).

  • Government rebates and incentives application processing.

These approvals can take anywhere from a few weeks to a couple of months, depending on local regulations.

4. Procurement of Equipment (1–4 Weeks)

Once approvals are in place, the necessary components—such as solar panels, inverters, battery storage, and mounting structures—are ordered.

Delivery times depend on:

  • Stock availability – Some high-demand components may have longer lead times.

  • Custom equipment requirements – Larger or more advanced systems may require special orders.

5. Installation and System Setup (3 Days – 6 Weeks)

The actual installation process depends on system size and complexity:

Installation Timeline for Different Systems:

chart

6. System Testing & Commissioning (1–2 Weeks)

Once installed, the system undergoes testing and commissioning to ensure:

  • All components are functioning correctly.

  • The system is safely connected to the grid.

  • Monitoring software is set up for real-time energy tracking.

This step usually takes one to two weeks and is critical for ensuring long-term performance.

7. Final Inspection and Handover (1 Week)

After commissioning, a final inspection is conducted to:

  • Confirm that the system meets safety and compliance standards.

  • Provide the business owner with operational training on using and monitoring the system.

  • Submit all necessary paperwork for government incentives and rebates.

Once completed, the system is ready to operate and start delivering energy savings.

Estimated Total Timeline for Installation

The full installation process, from initial consultation to final activation, typically takes:

  • Small commercial systems: 4–8 weeks

  • Medium systems: 2–3 months

  • Large commercial installations: 3–6 months

How Jousto Ensures a Fast & Efficient Installation

Jousto is committed to delivering fast, high-quality installations while minimising disruptions to business operations. Here’s how Jousto ensures a smooth process:

1. Expert Site Assessments

Jousto’s team conducts detailed energy audits to design a system that perfectly matches your business needs, reducing delays caused by miscalculations.

2. Handling All Approvals & Paperwork

Navigating approvals can be time-consuming, but Jousto manages the entire process, including:

  • Grid connection applications

  • Council and regulatory permits

  • Government rebate submissions

3. High-Quality Equipment & Reliable Supply Chain

Jousto works with trusted suppliers to ensure quick delivery of:

  • Premium solar panels

  • Advanced battery storage solutions

  • Reliable inverters and mounting systems

4. Professional Installation by Certified Technicians

Jousto’s installers are fully licensed and trained to complete the job safely and efficiently.

5. Post-Installation Support & Monitoring

After installation, Jousto provides:

  • System monitoring setup for real-time tracking

  • Maintenance and support services

  • Guidance on optimising energy usage for maximum savings

Common Questions About Commercial Energy System Installation

Will My Business Experience Disruptions During Installation?

Jousto plans installations carefully to minimise disruptions. Most businesses can continue operating as usual during the process.

Do I Need to Upgrade My Electrical System?

Some commercial properties may require switchboard upgrades or additional wiring to handle the new energy system. Jousto assesses this during the initial site visit.

Can I Install a Battery Later If I Start with Solar?

Yes! Jousto can design a solar system that’s battery-ready, allowing businesses to add storage when needed.

How Soon Can I Start Saving After Installation?

Savings begin immediately once the system is switched on, with most businesses seeing significant reductions in electricity bills from the first month.

Conclusion

The installation of a commercial solar or battery system takes anywhere from 4 weeks to 6 months, depending on system size and complexity. While approvals and equipment procurement can take time, Jousto’s streamlined process ensures a fast, hassle-free installation.

Investing in a commercial energy system can lead to massive cost savings, greater energy independence, and long-term sustainability benefits.