Standard Installation

What's included in our standard installation packages

All installations are completed by our network of SAA accredited partner installers

Solar PV Systems

Standard installation for solar panel systems includes professional mounting and electrical connection to your existing infrastructure.

Standard Installation Includes:

  • Colorbond roof - Standard tin/metal roofing
  • Single storey home - Ground-level installation access
  • Inverter location - Mounted outside within 5 meters of switchboard
  • Switchboard - Space for up to 2 new circuit breakers in the DIN rail
  • Grid connection - Standard grid-tie connection and metering setup
Solar + Battery / Battery Bundles

Standard installation for battery systems includes professional mounting and electrical connection with backup power configuration.

Standard Installation Includes:

  • Colorbond roof - Standard tin/metal roofing (for solar panels)
  • Single storey home - Ground-level installation access
  • Equipment location - Inverter and battery mounted outside within 5 meters of switchboard
  • Switchboard - Space for up to 3 new circuit breakers in the DIN rail
  • Backup circuits - Configuration of essential backup circuits (if applicable)
What May Require Additional Assessment

If your property differs from the standard installation requirements, additional costs may apply. Our team will assess your site and provide a custom quote.

Roof Variations

  • • Tile roofing (terracotta, concrete)
  • • Slate or shingle roofing
  • • Flat roof installations
  • • Asbestos roof (requires specialist removal)

Property Variations

  • • Multi-storey buildings
  • • Equipment location more than 5m from switchboard
  • • Switchboard upgrade required
  • • Complex electrical configurations

Need a Custom Installation?

If your property has unique requirements, book a free 30-minute design session with our team.

Our Installation Process
1

Purchase

Complete your order through our secure checkout

2

Site Assessment

Our installer contacts you within 48 hours

3

Installation

Professional installation by SAA accredited installers

4

Commissioning

System testing, handover, and warranty activation